ajaliselt pikim omavahel seotud tegevuste jada, mis määrab projekti kestuse
the series of activities that determines the duration of the project
sequence of activities that determine the earliest possible completion date for a project or phase
the longest path (sequence of activities) needed to deliver project outputs
Hea teada
In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project. See critical path method).
On ka teised teed (loogilised tegevuste jadad), mis mingite asjaolude mõjul võivad muutuda projekti kriitilisteks teedeks (või ka kriitilisteks ahelateks) (Allikas: Kiho)