Endurance tests
3.1. The AAD shall be supplied with current at the rated voltage and with the connecting lead resistances specified in items 2.1.3 and 2.1.5, and operated 50 000 times, each time for one second followed by an interval of four seconds. During the test, the AAD shall be ventilated by an air current having a speed of approximately 10 m/sec.