Kui soovid oma küsimusele vastust, jäta meile oma e-posti aadress.
Aitäh, oleme tagasiside kätte saanud.
the point, within the take-off and initial climb phase, before which the helicopter’s ability to continue the flight safely, with the critical power unit inoperative, is not assured and a forced landing may be required